Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice|第 18 條|原子能|Regulation|In Force

第 三 章|核能安全委員會|v1.0

Last Amended: 2018-12-22

Content

Paragraph 18.1 Applicants for use of sealed radioactive material or equipment capable of producing ionizing radiation for which a permission application shall be made shall, when applying for import or transfer, fill out an application form, enclose the following documents and make an application to the competent authority for review. In cases that shield engineering is involved in the installation, the installation permission will be granted after review and approval; in cases that shield engineering is not involved in the installation, following the grant of permission by the competent authority for import or transfer, the documents referred to in Paragraph 18.2 shall be enclosed to the competent authority for review, inspection and approval, after which the permit for use will be issued: 1.a photocopy of the certification of establishment or the registration approved; waived for government agencies (institution); 2.photocopies of the relevant operating personnel credentials and the certificates of employment; 3.workplace radiation safety assessment. In cases that shield engineering is not involved, a shielding planning need not to be enclosed; 4.a radiation protection plan and radiation safety operation guidelines; 5.photocopies of the certificates of radiation protection personnel shall be submitted in conformity with the stipulations in the Standards for Establishment of Radiation Protection Management Organizations and Radiation Protection Personnel; and 6.for use of sealed radioactive material of Category I or Category II as listed in Table I, a security planning shall be submitted. Paragraph 18.2 Only after the applicants referred to in the preceding paragraph have obtained the installation permission can installation begin in accordance with the officially approved workplace radiation safety assessment, the floor plans and the shielding planning. Within 30 days after completion of the installation, the following documents are to be enclosed to the Competent Authority for review, inspection and approval, after which the permit for use will be issued: 1.a radiation safety survey report (hereinafter referred to as "survey report"); 2.for sealed radioactive material conforming with the stipulations referred to in Paragraph 54.1, a sealed radioactive material smear test report shall be submitted (hereinafter referred to as "smear test report"); and 3.for sealed radioactive material, a photocopy of the original certification document of radioactive material shall be submitted.

Related Regulations - Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice

  • 金融控股公司財務報告編製準則 - Article 20(第 20 條)
  • Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice - Article 23(第 23 條)
  • Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice - Article 15(第 15 條)
  • Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice - Article 16(第 16 條)
  • Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice - Article 17(第 17 條)
  • Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice - Article 19(第 19 條)
  • Administrative Regulations for Radioactive Material and Equipment Capable of Producing Ionizing Radiation and Associated Practice - Article 20(第 20 條)